Total Credit: ₹ 4,16,135 /-

Total Debit: ₹ 9,21,616.90 /-

Balance: ₹ -5,05,482.09 /-

Project - Material: ₹ 200 /-

General: ₹ 291 /-

Civil material: ₹ 92,005 /-

Carpentry material: ₹ 2,59,040 /-

Plumbing material: ₹ 705 /-

Electrical material: ₹ 52,226 /-

Material and Labour: ₹ 2,69,650 /-

Civil labour: ₹ 1,17,200 /-

Carpentry labour: ₹ 10,000 /-

Electrical labour: ₹ 15,505.89 /-

POP labour and material: ₹ 47,369 /-

Conveyance: ₹ 290 /-

₹ 8,64,481.90

Design6
Req8
Ord8
Del8
Bil8
Paid8
Can8
# Mode Date Credit Debit Title
7755 Cash 19/01/24 - ₹ 5,000 Shive profile.
6493 Cash 13/05/23 - ₹ 2,600 Profile shutter
6371 Cash 29/04/23 - ₹ 9,000 Paid to tejas d zart for flooring etc
6352 Cash 23/04/23 - ₹ 1,500 Suresh kadiya.
6309 Cash 12/04/23 - ₹ 300 8 mm ply top for center table.
6173 Cash 04/04/23 - ₹ 2,800 Paid to Anand febricator final payment.
6264 VKICICI144 01/03/23 - ₹ 10,000 painting
6217 SPADEHDFC 27/02/23 - ₹ 60,000 virendra trendz modular
6256 VKICICI144 20/02/23 - ₹ 2,200
6259 VKICICI144 20/02/23 - ₹ 2,850 POP final settlement
6205 SPADEHDFC 31/01/23 - ₹ 8,269 Fabric for sofa
6119 Cash 26/01/23 - ₹ 5,000 Fayaz/vakil Advance for sofa cum bed
6114 Cash 25/01/23 - ₹ 11,250 Light fixtures from Tashi light.
6197 SPADEHDFC 20/01/23 - ₹ 1,00,000
6092 Cash 17/01/23 - ₹ 50 8 model surface box for tall unit.
6085 Cash 16/01/23 - ₹ 4,100 Mahanager gas meter fixing & pipe line
6088 Cash 16/01/23 - ₹ 51,000 Hiren Navkar Aluminium sliding window
6065 Cash 13/01/23 - ₹ 230 Shelf button for kitchen & rawal plugh.
6048 Cash 09/01/23 + ₹ 49,000 Check given on the name of varun.
6049 Cash 09/01/23 - ₹ 49,000 Given to Hiren Navkar Aluminium.
6042 Cash 08/01/23 - ₹ 50 Watchman.
6043 Cash 08/01/23 - ₹ 12,400 Paid to M.R.ciramic.
6047 Cash 07/01/23 + ₹ 49,000 Check given on the name of shrikant
6193 SPADEHDFC 06/01/23 - ₹ 30,000
6039 Cash 06/01/23 - ₹ 200 Akshay for visiting to Vasai & Ram mandir.
6045 Cash 06/01/23 + ₹ 49,000 Berar check given on shrikant kekre.
6051 Cash 06/01/23 + ₹ 20,000 Aakshya give back cash.
5362 Cash 05/01/23 - ₹ 30 Tye band
6191 SPADEHDFC 04/01/23 - ₹ 11,800
5361 Cash 04/01/23 - ₹ 700 Guru helper of suresh ladiya
6237 VKICICI144 02/01/23 - ₹ 500
6238 VKICICI144 02/01/23 - ₹ 650 LED light behind mandir jaali
5343 SPADEHDFC 29/12/22 - ₹ 34,331 Advance for modular work
5347 GKSBI828 28/12/22 - ₹ 5,000 Advance for purchase of moulding .
5321 Cash 26/12/22 - ₹ 90 Visit to jitu factory at Andheri.
5269 Cash 22/12/22 - ₹ 260 Hitex/sand pepar/Pana for main door lock.
5312 GKSBI828 22/12/22 - ₹ 10,000 labour charges paid to madhu (Yogesh singh) carpenter.
5264 Cash 21/12/22 + ₹ 48,000 Withdrawal from SBI vazira br.
5266 Cash 21/12/22 - ₹ 1,550 1 sheet sunmica for main door bak side.
5256 Cash 20/12/22 - ₹ 570 2/3/4/6/8 modle plate for carpentry cutting.
5309 GKSBI828 20/12/22 - ₹ 10,000 Paid to suresh kadiya
5215 GKSBI828 17/12/22 + ₹ 57,135 credit given by Manish zaa
5242 Cash 17/12/22 - ₹ 13,500 Maharashtra ply
5288 SPADEHDFC 17/12/22 - ₹ 21,200 ceiling fans
5239 GKICICI780 16/12/22 - ₹ 57,135 transferring to SBI account
5196 Cash 15/12/22 - ₹ 1,650 Electrical material
5191 Cash 06/12/22 - ₹ 36,400 Paid to pinnacle enterprises (satyam Jain)
5203 SPADEHDFC 05/12/22 - ₹ 10,000 balkesh
5123 VKICICI144 02/12/22 - ₹ 150 floor marking tape
5080 Cash 01/12/22 - ₹ 3,855 Bill of pipe & other materials.
5093 SPADEHDFC 24/11/22 - ₹ 17,723 payment given to balkesh for purchase of material.
5065 Cash 19/11/22 + ₹ 48,000 Received through SBI vazira.
5111 VKICICI144 14/11/22 - ₹ 1 civil material tempo
4976 Cash 11/11/22 - ₹ 120 Plastic nahani trap Jali
5044 Cash 11/11/22 - ₹ 500 Paid to kamlesh, he meet me at ground floor of 608
5022 SPADEHDFC 09/11/22 - ₹ 18,000 AC copper tubing and drainage
5005 GKSBI828 08/11/22 - ₹ 10,000 suresh civil labour
5010 SKSBI693 04/11/22 - ₹ 150
5011 SKSBI693 04/11/22 - ₹ 1,200 HDMI wire
4667 Cash 22/10/22 - ₹ 200 Diwali gift to watchman. Two watchman.
4659 Cash 21/10/22 - ₹ 5,000 Kamlesh Given at home when he came to repair RGB of solanki.
4649 Cash 18/10/22 - ₹ 400 Drill bit 12" x 20 mm & RCC cutter blade.
4892 SPADEHDFC 12/10/22 - ₹ 2,263 wires
4894 SPADEHDFC 12/10/22 - ₹ 3,963 wires
4642 Cash 12/10/22 - ₹ 55,000 Paid to M.R.ciramic.
4885 SPADEHDFC 10/10/22 - ₹ 14,646 material purchased for framing
4638 Cash 10/10/22 - ₹ 1,045 Laxmi Hardware gorai.
4871 SPADEHDFC 04/10/22 - ₹ 5,000 suresh civil labour
4873 SPADEHDFC 04/10/22 - ₹ 5,000 electrical labour
4779 GKSBI828 04/10/22 - ₹ 20,000 suresh civil labour
4816 SKSBI693 01/10/22 - ₹ 585 aluminium bottom for suresh
4616 Cash 30/09/22 - ₹ 2,100 Tiles
4617 Cash 30/09/22 - ₹ 300 1 liter urp waterproof chemical brought by dattu
4610 Cash 29/09/22 - ₹ 40 Prit out.
4612 Cash 29/09/22 - ₹ 135 Plumbing materials
4815 SKSBI693 29/09/22 - ₹ 17,750 Spotted marble
4609 Cash 28/09/22 - ₹ 4,100 Pipe junction box etc.from laxmi gorai.
4864 SPADEHDFC 27/09/22 - ₹ 70,000 box grill
4777 GKSBI828 27/09/22 - ₹ 50,000 suresh civil labour
4601 Cash 26/09/22 - ₹ 1,500 Iron rod
4581 Cash 23/09/22 + ₹ 48,000 withdrawal from sbi by varun
4532 Cash 06/09/22 - ₹ 2,670 Kota laddi
4510 Cash 30/08/22 - ₹ 50 Khila for fixing Tarpatri
4511 Cash 30/08/22 - ₹ 20,000 Suresh kadiya.
4686 GKICICI780 20/08/22 - ₹ 5,005.89 electrical labour kamlesh
4486 Cash 08/08/22 + ₹ 48,000 withdrawn cash by varun from SBI vazira